Wednesday, April 30, 2008

The House is Coming Along

Daves world has been interesting of late. A few months ago, David found an ad on craigslist for some property nearby that had a water lease attached to it. He contacted the owner and started proceedings to aquire the water lease so he can have a place to run his Marine Salvage and Construction business. Its been a lot of logistal run-around to get this done. He found a wonderful woman who believes in his vision and has joined forces with him to make this happen.

The water lease is completly out of the water at low tide so dredging will be neccesary. To get that done he had to have an enviromental survey done, deal with Fisheries, the City of Richmond,and Enviroment Canada to name a few. He may have to wait until August to start dredging , so as not to impact the fish runs. In the meantime, he has rented space at a local shipyard and bought a ton of material to build docks and floats. He met a man who is getting rid of a bunch of mobile homes for free and is getting them hauled down here so he can build floats for them and turn them into floathomes.

While waiting for the wheels of city hall to move and give him the go ahead to start, he has taken advantage of our warmer weather of late to do some more work on his his own floathome. He covered all the outside walls in heavy black plastic to seal it up better. He is planning to put metal siding over that. Originally he wanted to use cedar cutoffs, but is realizing that he has a weight issue with the house and has to keep that in mind when adding heavy material.

He finally got some decking put in around the sides of the house, and got a nice big float for the front deck in place. The temporary interior walls have come down and the floors ripped up (AGAIN!!)so he can fix some of the stringers that cracked under the weight of the wood cookstove. He has put some doorskins on a few of the walls which helps to make it look more like a home and less like a garage. He had a few days of hard work ahead of him trying to level the rest of the floor in the bathroom and workshop, then the bathroom finally got built. He has most of the tiling done in the shower and we've installed a new on-demand propane hot water heater.

The workshop has been rebuilt and there is now organization of the tools happening. If all goes well, I think he should have the place done by fall. In the meantime it will be a good summertime place with all the space and decks to play on.